    1.  Generalities

2.  Safety instructions

3.  Transport and storage

4.  Description / documents

5.  Installation

6.  Operation / putting into and out of operation

7.  Commissioning / Maintenance

8.  Troubleshooting

9.   Guarantee


1.    Generalities


The following operation instructions are for YFL ball valves, which serve to shut the flow of liquids, gases and steams in pipe lines, and of course to let it through, whenever they are in OPEN status.


By a correct assembling, maintenance or repair we guarantee an activity free of troubles. The manufacturer carries no responsibility for efficiency and safety of the valves, whenever these operating instructions are not observed and accurately.


A non-observance of this warning can cause injuries to persons and defects of the machines, such as:

-Injuries caused by escaped medium (cold/hot, toxic, under pressure),

-Affect in activity or damage of the valve.


The descriptions and rules included in this operation instruction refer to standard types but are also valid for alternatives.


It is essential that the valves are handled by skilled staff that must be aware of the interactions between the valves and the system in which they are installed.

An incorrect use of a valve may cause strong consequences to the complete system, such as:

-  Escape of medium

-  Stop of the unit

Affects, decreases or increases of operation or work of a system or unit.


For any further inquiries or in case of damage, please contact YFL Flow Control Co., Ltd.


In case of local inquiries or orders, especially for spare parts, please indicate the production or factory serial number, the type, the model version and possibly also the year of construction.


The technical data referring to the valves can be found in their technical documentations (paragraph 4.5).

In case of a return transport it has to be proceeded as explained in paragraph 3 <Transport>.


2.    Safety


These operation instructions contain essential information that has to be observed by assembling, operation and commissioning of the valves.


For this reason they have to be read by the assembling staff, by the skilled staff and by the operator before the valve is assembled and put into operation and they should always be kept in the proximity of the valve.


Not only the general safety rules indicated in this main paragraph have to be observed, but also the other ones indicated in other paragraphs.


Indication of notes in the operation instructions


The safety warnings contained in this operation instruction, which have to be observed in order to avoid injuries to persons, are indicated by the following general and particular picot-graphs:


Warning!


Security signal acc. to DIN 4844 W 9 Beware of the electrical tension!


Security signal acc. to DIN 4844 - W 8


In order to avoid defects of valve efficiency and of its accessories the following warning.


The signs marked directly on the valve have absolutely to be considered and kept in a readable condition.


Dangers that can result if safety instructions are not observed.


If the safety instructions are not observed injuries to persons, environment and valve, or system can arise and the indemnity rights get lost.


In particular the non-observance of the safety notes can cause dangers such as:

Break down of important functions of the valve or unit

Failure of prescribed methods of commissioning and handling

Danger to persons caused by electrical, mechanical and chemical impacts.

Environmental injuries caused by a leakage of dangerous materials.


Working with safety consciousness


The safety instructions included in this paper, the national regulations for prevention of accidents, as well as the internal regulations referring to work, operation and safety have to be observed by the operator


Safety instructions for the operator / user


-   When ever some hot or cold valve parts may cause any danger, these parts have to be constructed in a way that they are protected from contacts.

The contact protection for moving parts (such as coupling) must not be taken away while the machine is working.

Leakages of dangerous conveyed materials (explosive, toxic, hot) have to be removed in a way that no danger to persons or environment can arise.

Injuries by electrical energy have to be excluded (please find details to this point in local power supply enterprise regulations).


Safety instructions for commissioning, inspection and assembly works


It must be provided that all commissioning, inspection and assembly works are executed by skilled staff, who must have previously studied these operation instructions.


Basically when any kind of work on a valve is executed, the valve has to be cooled down and free of pressure and the evaporation temperature of the medium must be lower than the temperature of all parts it gets in contact with.


Also basically, works on a valve have to be executed when it is stopped. The procedure to stop a valve operation is described in this paper and has absolutely to be observed.


Valves which get in touch with health injuring media have to be decontaminated.


Immediately after the work is done, all safety and protection devices have to be put into position or operation again. Before putting the valve into operation again, the points referring to paragraph 6 <putting into operation> have to be observed.


Arbitrary reconstruction and manufacture of spare parts


Reconstructions or modifications of the valve are only acceptable under agreement with the manufacturer. The use of original spare parts and by the manufacturer authorized accessories promotes safety. If any damage is caused by using other parts the liability for the consequences can be cancelled.


Inadmissible operation modes


A safe operation is only guaranteed if the valve is used according to the determinations included in the “generalities” of this operation instruction. The limits included in the technical documentation must not be exceeded.


3.    Transport and storage


Corrosion protection

Carbon steel valves


Valves made out of unalloyed or low alloyed cast steel are painted with a hard sticking primer made of a 2-components colour based on epoxy resin paint. The minimum film thickness is 70 μm. The inner surfaces are free of paint and only coated with a temporary corrosion protection (e.g. oil). Machined flange facings are protected against outside influences with a strippable vanish.


Stainless steel valves


Valves made out of stainless steel will be delivered without coating. Stainless steel ball valves are supplied with a passivated treatment to ensure body is protected against the adhesion of ferritic particles.


Transport


The valves are delivered in a closed condition and its connecting holes are shut up by cover caps.


Valves will be supplied as ready for operation.


During transportation and storage valve have to be closed. Connecting holes have to be shut up by suitable means (cover caps, foils) in order to avoid any damage to the valve seats.


Transport or lifting a valve by suitable equipment refer to the weight of the valves. Valves must not be lifted by the handle!


Storage


The storage has to be effected in a way that it can work perfectly even after a longer storage period.


For this purpose it is necessary

-  To keep the valve closed (in order to protect the seat facings)

-  To take measures against soiling (dust, sand, mortar, respectively building materials), frost and corrosion using plastic foils.

-Stainless steel and carbon steel valves should be stored separately, to protect the stainless steel against corrosion.


When storing valves with soft gaskets (of elastomer) the storage regulations for elastomer have to be observed:

The store must be dry, free of dust and moderately ventilated. Store temperature should not go over 25°C.,

stocks on hand have to be used up in order to avoid long storage periods,

As already mentioned above, the valves have to be in “closed” position during the storage. However the soft closure elements should be shut with little power, in order to avoid a rush aging of the elastomer.


4.  Description / documents


Structure and standards

Split body, full bore,

Anti-static structure, blow out proof stem,

Flanges acc. to EN 1092-1(for ANSI valves acc. to ASME B16.5 ) Face to face acc. to EN 558-1(for ANSI valves acc. to ASME B16.5 ) Firesafe acc. to API 607

Test acc. to EN12266-1(for ANSI valves acc. to API 598 )

  General view and parts list


NO.

Part

Material

1

Adapter

1.4408

1.0619

2

Bolts

A4-70

1.7225

4

Body

1.4408

1.0619

5

Ball

1.4401

1.4301

7

Seat

RPTFE / PTFE with fiberglass / VX1

RPTFE / PTFE with fiberglass / VX1

17

Nut

1.4401

45

18

Lever

1.4308(DN100/ C45 GalvanizationDN

GGG40(DN100/ C45 DN100

19

Gasket

1.4301

1.4301

20

Bolts

A2-70

35


The stuffing box structure see the datasheet.

 

4.3 Temperature


    Body material suitable for Temperature as follow: a. Carbon steel 1.0619: -29℃~+425

b.  Carbon steel WCB:       -29℃~+425

c.  Stainless steel 1.4408:  -196℃~+540℃(for flanged connection valves)

+815℃(for carbon content≥0.04%)

d.  Stainless steel CF8M:  -196℃~+540℃(for flanged connection valves)

+815℃(for carbon content≥0.04%)

    Gasket material suitable for Temperature as follows: a. PTFE: -180~+200

b.  Flexible graphite: -200~+570℃ (Oxidizing medium)

+800℃ (Non-oxidizing medium)

c.  Metal sealing circle the same as 4.3.1


4.4 Medium


For carbon steel valves: non-corrosive, such as water, steam, and oil. For stainless steel valves: can be corrosive, 4.0≤PH≤10.0


The valves should be operated during the limits range refer to par. 4.3 and 4.4.


5.  Installation


Generalities 


The pipeline has to be installed in a way that injurious shearing and bending forces during installation and activity are kept away from the valve bodies . This is to avoid leakiness and destruction of the body.

  If possiblevalve shall be mounted in such way to allow periodic inspections.


Before installation the cover caps have to be removed from the connecting holes.

The flange facings must be clean and undamaged. The flange gaskets must be well centralized. Only bolts and gaskets of admissible materials may be used. For the flange connection all flange drill holes have to be used.

Once the installation is completed, valve must be operated for at least one opening and closing action to ensure perfect operation.


When  varnishing  the  pipelines,  no  bolts  and  nuts,  stems,  stuffing  boxes  and accessories must be painted (function affects). During any construction work the valves


have to be protected from dust, sand and any other construction material. (Please cover with suitable means).

Valve by-passes and all other adjacent parts must not be used as steps.

Valves and pipe lines working in high temperatures (>50°C) or low (<0°C) must be protect from touch by insulating. Alternatively the danger must be indicated by warning boards on the valve side.


Installation position


Ball valves can be installed with the stem in vertical or horizontal position or any other position.,but preferably to be installed with the stem in vertical position. Valves are bidirectional, so fluid can run in both directions.


Valves with motor


All electric devices such as adjusters, switch boxes, magnetic valves, end switches, etc., have to be installed in dry rooms and safe from overflow. Tension and frequency have to correspond to the data on the factory label.


6.  Operation / putting into and out of operation


 Operation/putting into operation


Generalities

Before putting the valve into operation its material, pressure and temperature data have to be compared with the operation terms of the pipe line.


The line system of new plants and especially after repair works has to be flushed in order to remove harmful solid matters, respectively bead of weld.


Operation

Looked at from above the valves can be closed or opened by turning the handle 90°. There is a limit nut which shall not be exceeded.


The use of any auxiliary lever to turn the handle is not admitted. Too big forces could be injurious because their seat seals could be squeezed.

Generallyball valves are applied in a way that they  are either  completely open or completely closed.


Function check up


The following functions have to be checked up:

The shutting function of the installed valve must be checked up opening and closing it several times.

The stuffing box packing efficiency has to be checked up before the first loading by full operation pressure and temperature. If necessary the stuffing box glands or nuts, have to be evenly tightened.

The sealing efficiency of the bolted bonnet connections with the flat seal must be examined after the first loading/warming up of the valve. (Maintenance-free valves too!) If necessary the bolts connections have to be gently, crosswise and evenly tightened.


 Putting out of operation

During longer standstill periods liquids whose form can change in concentration due to polymerization, crystallization, solidification or the like, have to be let out of the line system. If necessary the line system has to be rinsed by completely open valve.


7.  Commissioning / maintenance


Safety notes


During all commissioning and maintenance works on the valves the following safety notes as well as the general indications under paragraph 2 <safety> must be observed.


In any case, also in emergency, only suitable spare parts and tools have to be used, otherwise a perfect function is not guaranteed.


Valve disassembly


Before dismounting from the pipe line or before commissioning and repair works are made directly on the valve, more precisely:

before loosing the bolted bonnet

before loosing the gland flange bolts,

before loosing the stuffing box nut

The valve has to be completely discharged from pressure and has to be cooled up until the evaporation temperature of the medium is lower than all the chambers getting in contact with it. Then any scald can be excluded.


Opening a valve under pressure is a lethal danger!


In case those toxic or easily inflammable mediums are conveyed, or mediums the residues of which in contact with humidity of the air can lead to corrosion damages, the valve has to be drained and flushed, respectively ventilated.

If necessary protecting clothes and protective masks have to be worn.

Due to the installation position the residual liquid possibly remained in the valve have to be drained off and correctly disposed.

Before a possible transportation, the valves have to be carefully emptied and flushed.


Maintenance


The valves are constructed in almost all of their parts maintenance-free. Materials for sliding parts are chosen which cause a very minimal wear. In order to improve operation safety and to minimize repair costs, all valves, specially those ones which are seldom put into operation or are hard to get to, should be regularly tested, that means, put into operation (OPEN – CLOSED) at least once or twice a year.


The operator is responsible to determine the convenient test and maintenance intervals depending on the application of the valve.

The durability of maintenance-free valves and can be extended if:

the stem and stuffing chamber surfaces are kept clean and undamaged;

-   the mobile parts, such as stems are greased (except oxygen valves) by using  standard lubricants;

the stuffing box is punctually additionally packed or the packing is renewed;

the gasket is punctually renewed;

The safety warnings in par. 2, 7,1 and in par. 8 must be observed.


8. Troubleshooting


Generalities

All repair and maintenance works have to be done with suitable tools and original spare parts.

The safety notes in par.2 and 7 have to be observed.

Troubleshooting table


Description of trouble

Probable cause

Solution

Leakage of packing

1. Tightening of the packing not enough.

2.       Insufficiency   of   packing rings.

3.   Failure of the packing

1. Retighten     the   nut                of packing evenly.

2.   Add some more pieces of packing.

3.     Replace  the  packing  by new one.

Leakage      between         sealing surface

1.Dirt on the sealing surface. 2.Damage of sealing surface

1. Clean the dirt

2. repair the sealing  surface of replace the disc and seat ring.

Leakage  at  the  connection of body and bonnet

1. Untightening of connecting of it .

2.        Damage of the sealing surface of the body-bonnet flange or that of the bonnet and body of valve sealed by pressure.

3.   Failure of gasket or damage of metal sealing ring

1. Tighten the bolts uniformly .

2.   Repair the sealing surface of the body-bonnet flange or the body-bonnet flange or the of the bonnet and body of valve sealed by pressure.

3.     Replace gasket or repair the metal sealing ring.

Handle cant be turned flexibly or the ball cant be open or close

1.Over tighten the packing                         . 2.Crookedness of gland 3.Damage of the stem nut or dirt on it .

4.Wear or puncture of screw thread of stem nut

5. Bend of stem

1. Loose the nuts of packing properly.

2. Rectify the gland

3. Revise the screw thread of stem nut, and clean the dirt. 4.Replace the stem nut . 5.Rectify or replace the stem

Breakdown of electric

See the instruction of electric actuator

See     the           instruction           of electric actuator


For any further information please contact YFL Flow Control Co., Ltd.


9. Guarantee


The warrantee for our product is one year after commissioning date, or 18 Months from shipment whichever happens earlier. In this period, If there is any damage caused by material defect, improper manufacture, and unreasonable design, or it takes place under the normal condition. Repair and replacement of part is free of charge.

    Mots clés :

contact

laisser un message
Bienvenue à YFL
droits d'auteur © 2024 YFL FLOW CONTROL CO., LTD..tous les droits sont réservés.

domicile

des produits

sur

contact

Subscribe